Walk-in showers, tile and glass
Shower Remodel in Dallas, TX
A shower remodel in Dallas takes out the old tile, pan and valve and rebuilds the shower on a waterproofed base, with new tile, a niche or bench and glass. We measure it and quote it at your house for free.
5.0 on Google from 8 reviews
- Waterproofed base
- Tile & niche
- Frameless glass
- Licensed & InsuredBathroom remodeling in Dallas County.
- Free In-Home QuotesWe measure and price it at your house.
- 5.0 Stars on Google
- Local to DallasServing Dallas and 10 nearby cities.
What it is
What Is a Shower Remodel in Dallas?
A shower remodel in Dallas strips the shower to the studs and builds it back: waterproofing, a pan sloped to the drain, a new valve, tile, a niche or bench and a glass door or panel. The vanity, toilet and floor outside the shower can stay as they are.
Many Dallas homes built from the 1960s to the 1990s still have the original fiberglass insert or a tile shower on a mortar bed. When those fail, it shows as loose or cracked tile, dark grout lines, or a soft spot in the wall behind the valve.
Most Dallas houses sit on a concrete slab, so moving the drain means cutting the slab. The clay soil under North Texas homes can also shift enough to crack grout, which is why we look at the floor and the walls before we quote a new layout.
What's included
What a Dallas Shower Remodel Includes
A shower remodel in Dallas with CM Bathroom Remodel Dallas covers four parts of the shower: the waterproofing and pan, the tile, the valve and fixtures, and the glass. You pick the tile, fixtures and glass; we build everything behind them.
Waterproofing and Pan
A membrane behind the tile and a pan sloped to the drain. Tile and grout are not waterproof on their own.
Tile, Niches and Benches
Wall and floor tile in the size and pattern you choose, a recessed niche for bottles and an optional built-in bench.
Valve and Fixtures
A new shower valve with a rain head, a handheld on a slide bar or both, placed where they are easy to reach.
Glass Door or Panel
Frameless or semi-frameless glass, measured after the tile is set and installed on a later visit.

How it works
How a Shower Remodel Works, Step by Step
A shower remodel in Dallas runs in four steps, from the free in-home quote to the final walkthrough. You know the scope and the price before demolition starts.
Step 1: Free In-Home Quote
We measure the shower, check the walls, the floor and the drain, and go over tile, glass and fixture choices with you.
Step 2: Demolition
The old tile, pan or insert comes out down to the studs, with the room closed off and the floors covered.
Step 3: Waterproofing and Tile
New valve and drain, then the membrane, the pan, the tile, the grout and the sealer.
Step 4: Glass and Walkthrough
The glass goes in once the tile is set. Then we go through the finished shower with you.
Why CM
Why Dallas Homeowners Call CM for a Shower Remodel
CM Bathroom Remodel Dallas is a licensed and insured bathroom remodeler in Dallas. Three things set how we work on a shower remodel.
Licensed and Insured
CM Bathroom Remodel Dallas is licensed and insured for the bathroom work we do in Dallas and nearby cities.
Free Quote at Your House
We price the shower after measuring it and looking at the plumbing, not from a photo or a phone call.
Open 7 Days
Call any day of the week, 7 AM to 5 PM, to ask a question or set up the quote visit.
Cost
How Much Does a Shower Remodel Cost in Dallas?
The cost of a shower remodel in Dallas depends on four things: the size of the shower, the tile you choose, whether the drain or valve moves, and the type of glass. A same-size shower rebuilt in place costs less than a tub to shower conversion or a curbless shower, which change the plumbing and the floor.
You get the price for your shower at the free in-home quote, before any work starts.
See what a walk-in shower costsWhat moves the price
- Size of the shower
- Tile you choose
- Drain or valve moves
- Type of glass
Related services
Related Bathroom Services in Dallas
A shower remodel in Dallas often goes with one of these three services, depending on whether the tub stays and how the floor is built.

Tub to Shower Conversion
The tub comes out and a walk-in shower is built in the same alcove.
- Low threshold
- Grab bars


Bathroom Tile Installation
New wall and floor tile when the layout of the shower stays the same.
- Walls & floors
- Sealed grout
Where we work
Shower Remodeling Near Dallas
We remodel showers across Dallas and in 10 nearby cities, including Highland Park, University Park, Irving, Richardson and Mesquite. Pick your city to see what we do there.
Asked often
Shower Remodel Questions From Dallas Homeowners
How long does a shower remodel take in Dallas?
A shower rebuilt in the same footprint usually takes one to two weeks of work in a Dallas home, and the glass goes in on a later visit after the tile is set. A tub to shower conversion or a curbless shower takes longer, because the drain and the floor change.
Do I need a permit to remodel a shower in Dallas?
Replacing tile in place usually does not need one. Moving a drain or changing the plumbing is permitted work in the City of Dallas, and we tell you at the quote visit whether your shower remodel needs a permit.
Can you remodel the shower without redoing the whole bathroom?
Yes. In most Dallas bathrooms the shower can be rebuilt on its own while the vanity, toilet and floor stay. We cover and protect the rest of the room during demolition.
What tile works best in a Dallas shower?
Porcelain tile is the most common choice for shower walls and floors in Dallas because it absorbs very little water. Small mosaic tile grips better underfoot on a shower floor, and large-format tile on the walls means fewer grout lines to clean.
Can my bathtub be turned into a walk-in shower?
Yes. Most Dallas tub alcoves are about 60 inches wide, which fits a walk-in shower with a low threshold and a glass door in the same space.
Free in-home quote
Get a Free Shower Remodel Quote in Dallas
Tell us about your shower and what you want to change. We'll call to set up a free in-home quote, any day from 7 AM to 5 PM.
- Free quote at your house
- Licensed and insured
- Open 7 days, 7 AM to 5 PM
